  • 摘要: 根据坪坑大桥桥址地形地貌、工程地质条件,设计了2套缆索吊装施工方案,并对其进行比选。综合分析得出方案采用主扣塔一体化设计能够保证拱箱吊装净空高度,塔架底部设计为铰接横移方式,满足施工要求,且提高了安全可靠度;上部采用新型贝雷桁架拼装,既节约成本又缩短工期。对拟实施方案吊装系统各绳索进行参数初选、不利工况验算,得出系统满足规范要求,并经主拱圈的实际拼装施工,顺利完成架设任务。

     

    Abstract: According to Pingkeng Bridge's site topography, engineering geological conditions, designing two sets of cable hoisting construction schemes(Ⅰ&Ⅱ), simultaneously comparison and selection between them is made. Based on comprehensive analysis, scheme that adopts the main tower integration design can ensure the required clearance height of lifting arch box, the bottom design of the tower, which utilizes hinged-joint-sliding structures, can be satisfied with the requirements of construction and improve the security and reliability. The new kinds of bailey trusses are applied to assembling the upper of the tower, not only cutting the cost, but also shortening the construction period. Primary selection parameters of all kinds of hoisting ropes are conducted for the scheme, which is intended to be performed. By unfavorable condition checking, it concludes that the cable-hoisting system meets the requirements of the standards. And the erection task has been successfully completed through the actual erection construction of main arch.

     

/

返回文章
返回